translation

This is an AI translated post.

durumis AI News Japan

Amazon, using the opportunity of terminating the contract with Yamato, establishes its own distribution network

  • Writing language: Korean
  • Base country: Japan country-flag

Select Language

  • English
  • 汉语
  • Español
  • Bahasa Indonesia
  • Português
  • Русский
  • 日本語
  • 한국어
  • Deutsch
  • Français
  • Italiano
  • Türkçe
  • Tiếng Việt
  • ไทย
  • Polski
  • Nederlands
  • हिन्दी
  • Magyar

Summarized by durumis AI

  • Significant changes are taking place in the Japanese logistics industry due to the overtime work limit regulations that came into effect in April 2024, and Japan Post has entered into a long-distance transportation partnership with Seino Holdings in response.
  • Through its collaboration with Seino, Japan Post is improving the efficiency of long-distance transportation, and through its partnership with Yamato Holdings, it has discontinued “Cat Mail” and outsourced the work to Japan Post.
  • In particular, Japan Post faces the limitation of being unable to easily reduce the number of post offices nationwide, so it is focusing on maximizing efficiency by making the most of its existing network.

I am Satoshi Fujita, a consultant for small and medium-sized enterprises. Based on my experience in providing comprehensive management support from large corporations to small and medium-sized enterprises, I will share insights into the "unknown aspects of famous companies" in depth.

The 2024 issue has triggered a major transformation in the logistics industry. Japan Post, the largest logistics company in Japan, has agreed to collaborate with Seino Holdings, the industry's fourth-largest player, on long-distance transportation. Yamato Holdings has entrusted some of its operations to Japan Post and terminated contracts with a large number of individual businesses. Amazon Japan is cautiously proceeding with contracts with individual businesses. Amazon Japan is building its own vast logistics network.

Japan's unique situation of "low loading efficiency" compared to Europe

The 2024 issue in the logistics industry, in simple terms, is the reduction of truck driver working hours. Starting April 1, overtime work hours were capped at 960 hours per year. This regulation, known as "work style reform," was already introduced for large companies on April 1, 2019. However, in industries such as logistics, construction, and healthcare, long working hours and a severe labor shortage were so prevalent that a grace period was set. That grace period has now ended.

According to Japan's "Study Group for Realizing Sustainable Logistics," the shortage of transportation capacity due to the overtime work hour cap regulation is estimated to reach 14.2% in 2024 and 34.1% in 2030. This projection assumes no countermeasures are taken for the current transportation system. Japan has a complex topography and includes areas where transportation is difficult, such as islands. Additionally, various companies, including small and medium-sized enterprises, have unique logistics networks.

According to the Ministry of Economy, Trade and Industry, Japan's truck loading efficiency is 39%. Europe's is 57%. ("Survey on Competitive Environment and Labor Environment in the Logistics Market"). Logistics in Japan is complex and inefficient. The partnership between Japan Post and Seino stems from this background. It is an effort to improve the efficiency of long-distance transportation.

Japan Post is utilizing its logistics infrastructure to the fullest...

Japan Post and Seino utilize adjacent hubs to stack and exchange cargo. This is expected to enhance efficiency, particularly during weekends when loading rates are lower. Pilot operations have yielded positive results, reducing the number of trucks without altering delivery times.

In June 2023, the Japan Post Group reached a basic agreement with Yamato Holdings for collaboration. This involves gradually phasing out Yamato's "Neko-pos" (Cat Postal Service) and entrusting its operations to Japan Post. The newly born "Neko-pos Mail Packet" involves Yamato accepting packages from customers and delivering them to designated locations, from where Japan Post handles the subsequent delivery.

Japan Post faces a major weakness in its inability to easily reduce post offices nationwide. Former President Hiroya Masuda sparked a major controversy when he mentioned the closure of post offices. Reducing the number of post offices, which serve as logistics and financial infrastructure for local residents, has faced opposition and concerns from local assembly members, local governments, and others since before the company's IPO. Therefore, Japan Post must strive to maximize the utilization of its established network. Through collaboration with Yamato, the number of mail packets handled in the March quarter of 2024 increased by 3.0% year-on-year to 1 billion. Handling volume had been on a declining trend, but it recovered to the level of the March quarter of 2021, benefiting from the online shopping boom.

Japan Post is hoping to improve the efficiency of long-distance transportation by utilizing its intricate last-mile logistics network through collaboration with Seino. Japan Post's efforts to enhance efficiency while maximizing its delivery network are a challenging task compared to other companies.

durumis AI News Japan
durumis AI News Japan
durumis AI News Japan
durumis AI News Japan
Convenience Store 24-Hour Operation Suspension and Labor Shortages Relief Measures Through Improved Working Conditions Various measures are being discussed to address the convenience store labor shortage. Examples include suspension of 24-hour operations, introduction of unmanned payment systems, and improvement of working conditions. In particular, the introduction of AI

May 6, 2024

Japan's high expressway tolls, concern over steep price increases, flat-rate system draws attention Japan's expressway tolls are among the highest in the world, and the timeframe for free expressways has been pushed back to 2115. This is due to high construction and maintenance costs, as well as the ongoing costs of repairing aging infrastructure. As a

May 12, 2024

Companies at the forefront of solving Japan's manufacturing labor shortage with innovative technology Daifuku of Japan has developed a "non-contact power supply system" that solves dust generation and fire prevention caused by friction, contributing to the resolution of labor shortages. It has become an essential technology in automobile, food, and semico

May 23, 2024

KOTRA Supports Korean Companies’ Entry into Japan's Power and Materials & Components Supply Chain The Ministry of Trade, Industry and Energy and KOTRA hosted the ‘2024 Korea-Japan Materials & Components Partnering Plaza’ in Osaka, Japan for two days from April 24th, supporting 47 domestic companies in the power and materials & components sectors to en
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)

April 25, 2024

KAIST Startup Team, Elderly Job Research Institute, Acquires Doodrim Quick… Expanding Subway Quick Business The Elderly Job Research Institute is a social venture that creates subway quick delivery jobs for seniors using IT technology, contributing to increased productivity and income. They have acquired Doodrim Quick, founded by Seoul National University stude
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)

May 27, 2024

Ministry of Trade, Industry and Energy and KOTRA to Recruit Second Batch of Participating Companies for Export Voucher Program The Ministry of Trade, Industry and Energy and KOTRA will be holding the second round of recruitment for the 2024 Export Voucher program to strengthen the export competitiveness of small and medium-sized enterprises. The Export Voucher program, which bega
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)

May 20, 2024

Taobao delivers to the world in less than an hour? China's real rocket delivery? Chinese online shopping mall Taobao has begun research on rocket delivery in partnership with a private space company. If this project is successful, delivery to anywhere in the world within an hour will be possible, and Taobao is expected to outpace AliE
cosanlog
cosanlog
cosanlog
cosanlog
cosanlog

April 1, 2024

Ministry of Trade, Industry and Energy and KOTRA to Help SMEs Enter Japan’s Largest Variety Shop 'LOFT' The 'Japan Loft One-on-One Entry Consultation Meeting' will be held in Seoul for two days from May 16th. Hosted by the Ministry of Trade, Industry and Energy and KOTRA, this event will feature 43 domestic companies from 5 sectors including beauty and stat
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)

May 17, 2024

Seoul Special City Federation of Small and Medium Enterprises Declares to Be the Backbone of Small and Medium Enterprises in Seoul at its Inauguration Ceremony The Seoul Special City Federation of Small and Medium Enterprises held the inauguration ceremony of its chairman, Yoo Deok-hyeon, and the inauguration ceremony of the Seoul Metropolitan Chapter on May 13. Yoo, a small and medium enterprise group expert wi
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)
스타트업 커뮤니티 씬디스 (SeenThis.kr)

May 17, 2024